Customization: | Available |
---|---|
Type: | FTTX Solutions |
Certification: | CE, ISO, RoHS |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
PG-FOSC-HJ0924 Optic Fiber Splice Closure
External Size | 465 × 250× 240mm(432 cores) |
Weight | 4.7kg |
Optical fiber winding radius | >40mm |
Extra loss of fiber tray | <0.01dB |
Fiber length left in tray | >1.6m |
Fiber capacity | 24cores, tape-shaped:432cores |
Working temperature | - 40 ~+70C |
Lateral pressure-resistance | >2000N /10cm |
1.1~1.6mfiber and 30~50mm steel core.
u Fix the cable pressing card and cable, together with cable reinforce steel core. If the diameter of the cable is less than the diameter of cable loop, first bind the cable fixing point with adhesive tape till the diameter is enough, then fix it.
u Lead the fiber into the melting and connecting tray, fix heat contract tube and heat melt tube to one of the connecting fiber. After melting and connecting the fiber, move heat contract tube and heat melt tube and fix the stainless (or quartz)reinforce core stick ,make sure the connecting point is in the middle of the housing pipe. Heat the pipe to make the two into one. Put the protected joint into the fiber-laying tray.(one tray can lay 24cores)
u Lay the left fiber in the melting and connecting tray evenly, and fix the winding fiber with nylon ties. Use the trays from the bottom up. After all the fiber has been connected, cover the top layer and fix it.
u Position it and use the earth wire in accordance with the project plan.
u Sealing the cable retainer nearing the inlet of splice closure and the joint of the cable rings with sealing tape. And close the unused inlets with plugs, with exposed concave parts of the plug sealed with tapes. Then put sealing trips into the sealing groove on the sides of the shell and grease the concave part of inlet of the body between the two parts of the shell. Then close the two parts of the shell and tighten it with stainless steel
bolts. The bolts should be screwed tightly with balanced force.
u According to the laying requirement, position and fix the hanging tool .
Q1: Wonder if you accept small orders?
A1: Do not worry. Feel free to contact us .in order to get more orders and give our clients more convener ,we accept small order.
Q2: Can you send products to my country?
A2: Sure, we can. If you do not have your own ship forwarder, we can help you.
Q3: Can you do OEM for me?
A3: We accept all OEM orders,just contact us and give me your design.we will offer you a reasonable price and make samples for you ASAP.
Q4: What's your payment terms ?
A4: By T/T,LC AT SIGHT,30% deposit in advance, balance 70% before shipment.
Q5: How can I place the order?
A5: First sign the PI,pay deposit,then we will arrange the production.After finished production need you pay balance. Finally we will ship the Goods.
Q6: When can I get the quotation ?
A6: We usually quote you within 24 hours after we get your inquiry. If you are very urgent to get the quotation.Please call us or tell us in your mail, so that we could regard your inquiry priority.